05/11/07 to 12/10/08
A1 Carpenters Lodge roundabout, Stamford
Major Junction Works
Narrow lanes with40 MPH speed limit limited over night closures
07/01/08 to 07/07/08
A1 Carpenters Lodge Roundabot
Road Work / Junction improvements
50 MPH speed limit on Northbound & Southbound carriageways from a point approximately 1600 metres north & south of the roundabout
07/01/08 to 07/07/08
A1 southbound from a point 600 metres south of A43 underbridge at Wothorpe to the A47 at Wansford. Northbound from a point 600 metres north of the A47 at Wansford to A43 at Wothorpe
Road Work / Junction improvements
Road closed with a signed diversion route
07/01/08 to 07/07/08
A1 junction of Racecourse Road & B1081 Old Great North Road
Road Work / Junction improvements
No access or exit from A1 at junction of Racecourse Road & B1081 Old Great North Road
07/03/08 to 06/09/09
(1) Whitepost Road (2) B1443 Thorney Road
Construction of new roundabout and associated works
40mph speed limit (1) between the A47 and B1443 Thorney Road. (2) between Crowland Road and Whitepost Road.
10/03/08 to 30/06/08
Fengate junction of Boongate
Installation of traffic signals
3 way temp traffic lights
18/04/08 to 18/07/08
Fletton Parkway between a point 1000 metres west of the west overbridge at junction 2 and a point 200 metres east of the east overbridge at woodston interchange junction 3.
Bridge Construction and strengthening works
Temporary 50mph speed limit
28/04/08 to 07/07/08
Lolham Bridges, King Street, Helpston
Bridge Repairs
The road will be closed to all users 24hrs a day, seven days a week for at least ten weeks starting from Monday 28th April 2008. King Street will be closed from Maxey Road to the B1443 Helpston to Ashton Rd (Bainton Green Level crossing) and diversion routes will be signed via Maxey Rd, A15, and B1443 Helpston
12/05/08 to 14/07/08
Lea Gardens, Boongate
Sewer construction works
Road closure - no alternative route
19/05/08 to 13/06/08
Fulbridge Road, junction of Mountsteven Avenue
Emergency bridge maintenance
Temp traffic lights 09.30-15.30
27/05/08 to 22/06/08
Bretton Way
Carriage way resurface
Carriageway lane closure
02/06/08 to 24/06/08
Park Road
Relay granite channel blocks and adjust gullies.
Daytime off peak 9.30-15.30 carriageway
09/06/08 to 11/07/08
Bretton Way
Carriageway resurfacing
Carriageway lane closure and convey when working near centre line.
12/06/08 to 27/6/08
Manor House Street
Carriageway resurfacing
Road closure and work on carriageway
23/06/08 to 04/07/08
London Road, Wothorpe
Highways improvement works
Road closure from A1 to First Drift, Traffic diverted via Via A1, Tinwell Road, Rutland Terrace, St Peter's Street, All Saints Street, watergate, St Mary's Hill, High Street, Old Great North Road & vice versa
23/06/08 to 04/07/08
Guntons Road
Masonry repairs to parapet on north side of bridge damaged by vehicle impact.
Two lanes will be restricted and one lane will be temporary traffic light operated.
16/06/08 to 15/12/09
Welland Road/ Newborough Road/ A47
Highway Improvement works
40mph speed limit, no right turn out of Newborough Road onto A47 traffic diverted via A47
16/06/08 to 04/07/08
Eastfield Road
Carriageway resurfacing
Carriageway stop and go
16/06/08 to 27/06/08
Peterborough Road, Newborough
Excavate and reconstruct North Road culvert
Road closure Open Overnight traffic diverted via White post road, Middle Road, Gunton's Road
16/06/08 to 14/07/08
A1M junction 17 southbound off slip
Reconstruction works
Slip road closure with traffic diverted via A1 southbound to junction 16 A1 northbound to junction 17
23/06/08 to 01/08/08
London Road Wothorpe
Install new gullies in carriageway and chambers in verge
Carriageway tempory traffic lights and give and take systems
26/06/08 to 11/07/08
Malborne way
Carriageway resurfacing
Carriageway lane closure to slip roads on junction 31 and road closure
29/06/08 to 29/06/08
St Peter's Road Peterborough
60th Anniversary of The Berlin Airlift Association
Road Closure from 06:00hrs until 14:00hrs on the 29/06/08. No alternative route available
30/06/08 to 04/07/08
Mountsteven Avenue
Footway resurfacing. Installation of boarders and hard standing with associated footway surfacing
Temporary traffic lights ahd a give and take system day time off peak 9.30-15.30
01/07/08 to 11/07/08
Bourges boulevard
Carriageway resurfacing
Carriageway overnight lane closure with convey traffic management
06/07/08 to 07/09/08
Mountstevens Avenue between Lincoln Road & Croyland Road
Carriageway resurfacing
Road closure diversion route TBA
07/07/08 to 18/07/08
Longthorpe Parkway
Carriageway resurfacing
Carriageway over night 20.00-06.00 lane closure and road closure
09/07/08 to 25/07/08
Peterborough Road Eye
Carriageway resurfacing
Carriageway overnight 20.00-06.00
15/07/08 to 01/08/08
Bretton Way Round about J53 and Rightwell East
Carriageway resurfacing
Carriageway over night 20.00 06.00 and stop and go traffic management
23/07/08 to 15/08/08
Storeys Bar Road
Carriageway resurfacing plus kebing and top soiling
Carriageway and verge 24hrs Road closure
26/07/08 to 07/09/08
Churchfield Road at the junction of Mountsteven Avenue
Carriageway resurfacing
Road closure diversion route TBA
28/07/08 to 22/08/08
Malborne Way west section from A1139 J2 East to subway
Carriageway resurfacing
Carriageway Road Closure and lane closure on junction 2 slip roads.Traffic management.
01/09/08 to 26/09/08
Fletton Parkway
Carriageway resurfacing HARD SHOULDER ONLY!
Carriageway and verge overnight 20.00-06.00
01/09/08 to 31/10/08
London Road Wothorpe
Replacement of kerbs chanels and improvements with carriageway drainage systems
Carriageway and verge
01/09/08 to 19/09/08
Paston Parkway
Carriageway resurfacing
Carriageway over night 20.00 06.00
01/09/08 to 26/09/08
Fletton Parkway
Carriageway resurfacing plus install bridge joints and counter loops after resurfacing
Carriageway and verge overnight 20.00 06.00
08/09/08 to 25/09/08
Orton Parkway
Carriageway resurfacing
Carriageway overnight 20.00-06.00 A1139 n/b closed at junction 1 using newcombe way as diversion route with lane closure on slip roads at J1 of fletton parkway.
08/09/08 to 26/09/08
Orton Parkway
Carriageway resurfacing
Carriageway over night 20.00 06.00